GuideUpdated 17 October 2026

How long a website
takes to build.

Typical timelines for each kind of site, what happens each week, and what slows a project down.

The short answer

At Anza Studios a one-page website is live in 5 days, a business site of up to six pages in 10 days, an online store in about 3 weeks and custom software in 6 to 12 weeks. Most websites live in under two weeks. What usually stretches a project is not the building: it is waiting for the words and photos, rounds of changes, and for an online store taking M-Pesa, Safaricom's approval, which takes 2 to 10 working days.

Timelines by kind of website

What you needLive inFrom
One-page website5 daysSh 35,000
Business website, up to six pages10 daysSh 75,000
Online store with M-PesaAbout 3 weeksSh 165,000
Custom software6 to 12 weeksSh 250,000

These are our own delivery times. A timeline from another designer should come with the same thing: a date, and a list of what they need from you to meet it.

What happens, step by step

  1. Day 0, a conversation. You say what the business does and what the site is for. Usually 30 minutes on WhatsApp or a call.
  2. Day 2, a proposal. A fixed price, a fixed date and a written list of exactly what you get.
  3. Day 3, your content. Your words, photos and logo. For a store, product photos and descriptions.
  4. Week 1, a preview. A live link you open on your own phone, with rounds of changes built into the price.
  5. Launch. Your domain connected and the site live, then thirty days of free edits.

What makes a website take longer

  • Content arriving late. The most common delay. If the words and photos are not ready by day three, the date moves by the same number of days.
  • Many rounds of changes. Each round is a few days. Collect everyone's comments into one reply rather than sending them one at a time.
  • M-Pesa approval. Before a site can take live payments, Safaricom checks the business. A published checklist puts this at 2 to 5 working days, stretching to 10 when Safaricom is busy or a document is missing 1. Start it early. See M-Pesa on a website.
  • Moving a domain. If your domain is held by an old designer or host, getting control of it can take longer than building the site. Find your login before the project starts.
  • Features that are really software. Bookings, member areas and dashboards turn a website into a software project, with its own timeline.

How to get it live sooner

  • Have your logo, photos and a few lines about each service ready before the first call.
  • Name one person who approves the design.
  • For a store, apply for your Till or Paybill and gather the business documents at the start.
  • Know who controls your domain today.

Sources

  1. McTaba Labs, "Daraja production checklist", updated 19 July 2026. mctaba.com

Anza Studios timelines are our current delivery times. The Safaricom approval time is a third party's published figure, read on 15 October 2026.

Leone Metto

Leone MettoFounder, Anza Studios. Updated 17 October 2026.